Close

Important Note!

    * Payment of Bid Fee can only be made by bank transfer to Chevron’s bank accounts. It is not allowed to make payments to the officers of Registration Office and through ATM or internet banking.
    * There’s no charge fee to become Chevron’s supplier.
Information in this page is solely for informational purposes, for detail information and requirements of the tender please see in Rincian Lelang (pdf.attachment).
Tender Type : Search :
Nomor LelangScope of WorkBusiness ClassificationRegistration LocationRegistration DateTender Detail
769/TA/JKT/2017 769/TA/JKT/2017

BEAM & GRATING
1. BEAM: TYPE N/A SIZE 300X300 MM BEAM: H, CARBON STEEL, ASTM A36, SIZE 300X300 MM, WEB 12 MM THK, FL 12 MM THK, 6 MT LENGTH 2. GRATING: TYPE WORK PL
Medium

INDUSTRI MATERIAL
Materi Logam Setengah Jadi antara lain: Pipa, Casing, Flange, Fitting, Elbow, Tee, Steel Bar, Wire Rope
Rumbai 15-DEC-2017 until 22-DEC-2017
767/TA/JKT/2017 767/TA/JKT/2017

ANODE: PIPING
ANODE: PIPING ROD LENGTH 30 IN. ROD DIA 8 IN MATERIAL CAST MAGNESIUM, PREPACKAGED SACRIFICIAL ANODE, CHEMICAL COMPOSITION: AL 0.01 PERCENT, MN 0.5 TO
Medium

INDUSTRI MATERIAL
Material Pelindung antara lain: Cat, Coating, Jacketing, Lining, Composite, Sacrificial Anode, Thermal Insulator
Rumbai 15-DEC-2017 until 21-DEC-2017
C1589027 WIN C1589027 WIN

PROVISION OF 2 (TWO) UNITS WORKOVER RIGH 350-450HP
KONTRAKTOR harus menyediakan 2 (dua) unit Rig Kerja Ulang 350-450 HP dengan Rotary Table dan/atau Working Platform yang harus memenuhi semua persyarat
High

OPERASI
KERJA ULANG SUMUR (WORKOVER)
Jakarta
766TAJKT2017 REV1 766TAJKT2017 REV1

ESP Equipment, Repair and Maintenance Services Contract
Kontraktor harus melakukan jasa-jasa ESP Equipment Supply, Instalation, Rapair and Maintenance Services untuk area KLO
High

PEKERJAAN LAIN-LAIN
PEKERJAAN LAIN-LAIN
Balikpapan 14-DEC-2017 until 21-DEC-2017
2728/JKT/2017 2728/JKT/2017

PIPELINE REPAIR AND INSPECTION SERVICES
Jasa-jasa konstruksi pekerjaan perbaikan pipa mencakup, pipa terbenam, pipa terbenam sebagian, pipa di atas penyangga yang memenuhi kode dan standar y
Medium

PERENCANAAN KONSTRUKSI A
MEKANIKAL
Rumbai 14-DEC-2017 until 18-DEC-2017
123